Manoj Kumar Trivedi
- Time-cost trade-off optimization model for retrofitting planning projects using MOGA. Dans: Asian Journal of Civil Engineering, v. 25, n. 5 (avril 2024). (2024):
- Construction time–cost–resources–quality trade-off optimization using NSGA-III. Dans: Asian Journal of Civil Engineering, v. 24, n. 8 (juin 2023). (2023):
- Discrete OBNSGA III method-based robust multi-objective scheduling model for civil construction projects. Dans: Asian Journal of Civil Engineering, v. 24, n. 7 (avril 2023). (2023):
- Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III. Dans: Asian Journal of Civil Engineering, v. 24, n. 8 (juin 2023). (2023):
- Integrating the multi-objective elephant herding optimization based time–cost trade-off model with earned value management. Dans: Asian Journal of Civil Engineering, v. 24, n. 4 (29 décembre 2022). (2022):
- Assessment of Surface Water Quality Index of Gwalior-Chambal Region Using Fuzzy-Based Approach. Dans: Journal of The Institution of Engineers (India): Series A, v. 104, n. 1 (novembre 2022). (2022):
- Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III. Dans: Journal of The Institution of Engineers (India): Series A, v. 102, n. 2 (mai 2021). (2021):