Lars Toverud
- (2017): Analysis and Repair of Vestmoen Bridge. Présenté pendant: IABSE Workshop: Ignorance, Uncertainty, and Human Errors in Structural Engineering, Helsinki, Finland, 15-16 February 2017.
- Replacement of the Superstructure of the Nitelva Railway Bridge. Présenté pendant: fib Symposium 2004, 26-28 April 2004, Avignon. (2004):