Hossein Toosi
- Deep Multilayer Perceptron Neural Network for the Prediction of Iranian Dam Project Delay Risks. Dans: Journal of Construction Engineering and Management, v. 149, n. 4 (avril 2023). (2023):
- Residential Real Estate Valuation Framework Based on Life Cycle Cost by Building Information Modeling. Dans: Journal of Architectural Engineering (ASCE), v. 27, n. 3 (septembre 2021). (2021):
- Comparative study of academic research on project management in Iran and the World with text mining approach and TF–IDF method. Dans: Engineering, Construction and Architectural Management. :
- A BIM approach for construction safety: applications, barriers and solutions. Dans: Engineering, Construction and Architectural Management, v. 26, n. 9 (septembre 2019). (2019):