Fulvio Tonon
- Numerical analysis on post-grouted drilled shafts: A case study at the Brazo River Bridge, TX. Dans: Computers and Geotechnics, v. 37, n. 4 (juin 2010). (2010):
- Modeling Triaxial Test on Intact Rock Using Discrete Element Method with Membrane Boundary. Dans: Journal of Engineering Mechanics (ASCE), v. 135, n. 9 (septembre 2009). (2009):
- A random set approach to the optimization of uncertain structures. Dans: Computers & Structures, v. 68, n. 6 (septembre 1998). (1998):
- Green's functions and boundary element method formulation for 3D anisotropic media. Dans: Computers & Structures, v. 79, n. 5 (février 2001). (2001):
- Multiobjective Optimization of Uncertain Structures Through Fuzzy Set and Random Set Theory. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 14, n. 2 (mars 1999). (1999):
- Multiobjective optimization under uncertainty in tunneling: application to the design of tunnel support/reinforcement with case histories. Dans: Tunnelling and Underground Space Technology, v. 17, n. 1 (janvier 2002). (2002):
- ADECO full-face tunnel excavation of two 260m² tubes in clays with sub-horizontal jet-grouting under minimal urban cover. Dans: Tunnelling and Underground Space Technology, v. 26, n. 2 (mars 2011). (2011):
- Sequential excavation, NATM and ADECO: What they have in common and how they differ. Dans: Tunnelling and Underground Space Technology, v. 25, n. 3 (mai 2010). (2010):
- Face stability and required support pressure for TBM driven tunnels with ideal face membrane – Drained case. Dans: Tunnelling and Underground Space Technology, v. 25, n. 5 (septembre 2010). (2010):
- Using random set theory to calculate reliability bounds for a wing structure. Dans: Structure and Infrastructure Engineering, v. 2, n. 3-4 (septembre 2006). (2006):
- Reliability-Based Design and Construction Issues for a Micropile Foundation in Costa Rica. Dans: Practice Periodical on Structural Design and Construction, v. 9, n. 4 (novembre 2004). (2004):
- Renovation of the 17th-Century Ponte Lungo Bridge in Chioggia, Italy. Dans: Journal of Bridge Engineering (ASCE), v. 11, n. 1 (janvier 2006). (2006):
- Interaction Diagram and Load Effects for Vertical Pile Groups with Application to the AASHTO LRFD. Dans: Journal of Structural Engineering (ASCE), v. 132, n. 3 (mars 2006). (2006):
- Replacement of Pontesei Bridge, Italy. Dans: Journal of Bridge Engineering (ASCE), v. 9, n. 5 (septembre 2004). (2004):