Robert Lee Kong Tiong
- Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production. Dans: Automation in Construction, v. 166 (octobre 2024). (2024):
- Strategic Workforce Planning for Production of Prefabricated Bathroom Units: An Advanced Markovian Approach. Dans: Journal of Construction Engineering and Management, v. 150, n. 8 (août 2024). (2024):
- (2023): A Data-Driven Method for Constructing the Spatial Database of Traditional Villages—A Case Study of Courtyard Residential Typologies in Yunnan, China. Dans: Buildings, v. 13, n. 12 (22 novembre 2023).
- Digital twin enabled real-time advanced control of TBM operation using deep learning methods. Dans: Automation in Construction, v. 158 (février 2024). (2024):
- Online multi-objective optimization for real-time TBM attitude control with spatio-temporal deep learning model. Dans: Automation in Construction, v. 158 (février 2024). (2024):
- Data-driven real-time advanced geological prediction in tunnel construction using a hybrid deep learning approach. Dans: Automation in Construction, v. 146 (février 2023). (2023):
- Critical success factors for BIM adoption during construction phase: a Singapore case study. Dans: Engineering, Construction and Architectural Management, v. 29, n. 9 (août 2022). (2022):
- Estimating Potential Economic Loss from Damage to RC Buildings in Singapore due to Far-Field Seismic Risk. Dans: Journal of Earthquake Engineering, v. 19, n. 5 ( 2015). (2015):