-
Caine, Christopher P. / Thomas, H. Randolph (2013): Negligent Tort Liability of the Design Professional. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 1 (février 2013).
https://doi.org/10.1061/(asce)la.1943-4170.0000098
-
Thomas, H. Randolph (2011): Project Closeout Process Proves Costly. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 4 (novembre 2011).
https://doi.org/10.1061/(asce)la.1943-4170.0000062
-
Thomas, H. Randolph (2010): Relief from Bid Mistakes. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 2 (mai 2010).
https://doi.org/10.1061/(asce)1943-4162(2010)2:2(120)
-
Thomas, H. Randolph (2010): Quantification of Losses of Labor Efficiencies: Innovations in and Improvements to the Measured Mile. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 2 (mai 2010).
https://doi.org/10.1061/(asce)1943-4162(2010)2:2(106)
-
Thomas, H. Randolph / Ellis, Ralph D. (2009): Judicial Reviews of Public Administrators in Awarding Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 3 (août 2009).
https://doi.org/10.1061/(asce)1943-4162(2009)1:3(118)
-
Thomas, H. Randolph (2009): Not Finding Anything Different and Not Reviewing All Documents Defeats DSC Claim. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 1 (février 2009).
https://doi.org/10.1061/(asce)1943-4162(2009)1:1(59)
-
Sinha, Sunil K. / Thomas, H. Randolph / Kulka, John R. (2007): Integrating Ethics into the Engineered Construction Curriculum. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 4 (octobre 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:4(291)
-
Thomas, H. Randolph / Volkman, Robert C. (2007): How Reliable Is the Total Cost or Modified Total Cost Method?. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (janvier 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(74)
-
Thomas, H. Randolph / Messner, John I. (2003): No-Damages-for-Delay Clause: Evaluating Contract Delay Risk. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 129, n. 4 (octobre 2003).
https://doi.org/10.1061/(asce)1052-3928(2003)129:4(257)
-
Thomas, H. Randolph / Brown, Daniel M. (1977): Optimum least-cost design of a truss roof system. Dans: Computers & Structures, v. 7, n. 1 (février 1977).
https://doi.org/10.1016/0045-7949(77)90056-6
-
Thomas, H. Randolph / Guevara, José M. / Gustenhoven, Carl T. (1984): Improving Productivity Estimates by Work Sampling. Dans: Journal of Construction Engineering and Management, v. 110, n. 2 (mars 1984).
https://doi.org/10.1061/(asce)0733-9364(1984)110:2(178)
-
Thomas, H. Randolph / Mathews, Cody T. / Ward, James G. (1986): Learning Curve Models of Construction Productivity. Dans: Journal of Construction Engineering and Management, v. 112, n. 2 (juin 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:2(245)
-
Halligan, David W. / Hester, Weston T. / Thomas, H. Randolph (1987): Managing Unforeseen Site Conditions. Dans: Journal of Construction Engineering and Management, v. 113, n. 2 (juin 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:2(273)
-
Thomas, H. Randolph / Willenbrock, Jack H. (1988): Managing Construction Research at Universities. Dans: Journal of Construction Engineering and Management, v. 114, n. 2 (juin 1988).
https://doi.org/10.1061/(asce)0733-9364(1988)114:2(245)
-
Thomas, H. Randolph / Smith, Gary R. / Wright, Dennis E. (1990): Resolving Disputes over Contract Notice Requirements. Dans: Journal of Construction Engineering and Management, v. 116, n. 4 (décembre 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(738)
-
Thomas, H. Randolph / Maloney, William F. / Horner, R. Malcolm W. / Smith, Gary R. / Handa, Vir K. / Sanders, Steve R. (1990): Modeling Construction Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 116, n. 4 (décembre 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(705)
-
Thomas, H. Randolph / Sanvido, Victor E. / Sanders, Steve R. (1989): Impact of Material Management on Productivity—A Case Study. Dans: Journal of Construction Engineering and Management, v. 115, n. 3 (septembre 1989).
https://doi.org/10.1061/(asce)0733-9364(1989)115:3(370)
-
Thomas, H. Randolph / Smith, Gary R. / Wright, E. Dennis (1991): Legal Aspects of Oral Change Orders. Dans: Journal of Construction Engineering and Management, v. 117, n. 1 (mars 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:1(148)
-
Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Misrepresentations. Dans: Journal of Construction Engineering and Management, v. 118, n. 3 (septembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:3(472)
-
Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Differing‐Site‐Condition Clause. Dans: Journal of Construction Engineering and Management, v. 118, n. 4 (décembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:4(767)
-
Thomas, H. Randolph (1991): Labor Productivity and Work Sampling: The Bottom Line. Dans: Journal of Construction Engineering and Management, v. 117, n. 3 (septembre 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:3(423)
-
Sanders, Steve R. / Thomas, H. Randolph (1993): Masonry Productivity Forecasting Model. Dans: Journal of Construction Engineering and Management, v. 119, n. 1 (mars 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:1(163)
-
Thomas, H. Randolph / Smith, Gary R. / Mellott, Robert E. (1994): Interpretation of Construction Contracts. Dans: Journal of Construction Engineering and Management, v. 120, n. 2 (juin 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:2(321)
-
Thomas, H. Randolph / Smith, Gary R. / Cummings, Daniel J. (1995): Have I Reached Substantial Completion?. Dans: Journal of Construction Engineering and Management, v. 121, n. 1 (mars 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:1(121)
-
Thomas, H. Randolph / Napolitan, Carmen L. (1995): Quantitative Effects of Construction Changes on Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 121, n. 3 (septembre 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:3(290)
-
Thomas, H. Randolph / Riley, David R. / Sanvido, Victor E. (1999): Loss of Labor Productivity due to Delivery Methods and Weather. Dans: Journal of Construction Engineering and Management, v. 125, n. 1 (janvier 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:1(39)
-
Thomas, H. Randolph / Horman, Michael J. / Minchin, R. Edward / Chen, Dong (2003): Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle. Dans: Journal of Construction Engineering and Management, v. 129, n. 3 (juin 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:3(251)
-
Thomas, H. Randolph / Horman, Michael J. / de Souza, Ubiraci Espinelli Lemes / Završki, Ivica (2002): Reducing Variability to Improve Performance as a Lean Construction Principle. Dans: Journal of Construction Engineering and Management, v. 128, n. 2 (avril 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:2(144)
-
Horman, Michael J. / Thomas, H. Randolph (2005): Role of Inventory Buffers in Construction Labor Performance. Dans: Journal of Construction Engineering and Management, v. 131, n. 7 (juillet 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(834)
-
Willenbrock, Jack H. / Thomas, H. Randolph (2007): History of Construction, Engineering, and Management in the Department of Civil and Environmental Engineering at Penn State. Dans: Journal of Construction Engineering and Management, v. 133, n. 9 (septembre 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:9(644)