Avi Telyas
- Lean Transformation in a Modular Building Company: A Case for Implementation. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 1 (janvier 2013). (2013):
- Case Study-Based Challenges of Quality Concrete Finishing for Architecturally Complex Structures. Dans: Journal of Construction Engineering and Management, v. 133, n. 3 (mars 2007). (2007):
- Constructing a Complex Precast Tilt-Up-Panel Structure Utilizing an Optimization Model, 3D CAD, and Animation. Dans: Journal of Construction Engineering and Management, v. 133, n. 3 (mars 2007). (2007):
- Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects. Dans: Automation in Construction, v. 31 (mai 2013). (2013):
- Post simulation visualization model for effective scheduling of modular building construction. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (septembre 2012). (2012):