0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Timothy R. B. Taylor

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Albalawi, Rakan K. / Goodrum, Paul M. / Taylor, Timothy R. B. (2023): Applying the Tier II Construction Management Strategy to Measure the Competency Level among Single and Multiskilled Craft Professionals. Dans: Buildings, v. 13, n. 5 (27 avril 2023).

    https://doi.org/10.3390/buildings13051175

  2. Ramadan, Bassam / Nassereddine, Hala / Taylor, Timothy R. B. / Goodrum, Paul (2023): Impact of technology use on workforce performance and information access in the construction industry. Dans: Frontiers in Built Environment, v. 9 (février 2023).

    https://doi.org/10.3389/fbuil.2023.1079203

  3. Minooei, Farzad / Goodrum, Paul M. / Taylor, Timothy R. B. (2020): Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior. Dans: Journal of Construction Engineering and Management, v. 146, n. 7 (juillet 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001867

  4. Kermanshachi, Sharareh / Safapour, Elnaz / Anderson, Stuart D. / Goodrum, Paul / Taylor, Timothy R. B. (2020): Establishment of Effective Project Scoping Process for Highway and Bridge Construction Projects. Dans: Practice Periodical on Structural Design and Construction, v. 25, n. 2 (mai 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000427

  5. Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. / Srinivasan, Cidambi (2016): Quantitative analysis of the impact of craft worker availability on construction project safety performance. Dans: Construction Innovation, v. 16, n. 3 (juillet 2016).

    https://doi.org/10.1108/ci-10-2015-0050

  6. Albattah, Mohammed A. / Goodrum, Paul M. / Taylor, Timothy R. B. (2019): New Metric of Workforce Availability among Construction Occupations and Regions. Dans: Practice Periodical on Structural Design and Construction, v. 24, n. 2 (mai 2019).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000413

  7. Dadi, Gabriel B. / Goodrum, Paul M. / Taylor, Timothy R. B. / Carswell, C. Melody (2014): Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. Dans: Journal of Construction Engineering and Management, v. 140, n. 5 (mai 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000827

  8. Taylor, Timothy R. B. / Ford, David N. / Reinschmidt, Kenneth F. (2012): Impact of Public Policy and Societal Risk Perception on U.S. Civilian Nuclear Power Plant Construction. Dans: Journal of Construction Engineering and Management, v. 138, n. 8 (août 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000516

  9. Taylor, Timothy R. B. / Uddin, Moin / Goodrum, Paul M. / McCoy, Alex / Shan, Yongwei (2012): Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 12 (décembre 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000550

  10. Karimi, Hossein / Taylor, Timothy R. B. / Dadi, Gabriel B. / Goodrum, Paul M. / Srinivasan, Cidambi (2018): Impact of Skilled Labor Availability on Construction Project Cost Performance. Dans: Journal of Construction Engineering and Management, v. 144, n. 7 (juillet 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001512

  11. Li, Ying / Taylor, Timothy R. B. (2014): Modeling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance. Dans: Journal of Construction Engineering and Management, v. 140, n. 9 (septembre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000878

  12. Taylor, Timothy R. B. / Ford, David N. (2008): Managing Tipping Point Dynamics in Complex Construction Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 6 (juin 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:6(421)

  13. Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. (2016): Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Dans: Construction Management and Economics, v. 35, n. 6 (avril 2016).

    https://doi.org/10.1080/01446193.2017.1294257

  14. Albattah, Mohammed / Shan, Yongwei / Goodrum, Paul M. / Taylor, Timothy R. B. (2017): Relationships between cycles of economic expansion in construction and craft workers' job satisfaction and preferences. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 1 (janvier 2017).

    https://doi.org/10.1139/cjce-2016-0358

  15. Dadi, Gabriel B. / Taylor, Timothy R. B. / Goodrum, Paul M. / Maloney, William F. (2014): Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (octobre 2014).

    https://doi.org/10.1139/cjce-2014-0019

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine