0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Gao, Yi / Tang, Yuanjie / Liu, Rengkui: Aggregation formulation for on‐site multidepot vehicle scheduling scenario. Dans: Computer-Aided Civil and Infrastructure Engineering.

    https://doi.org/10.1111/mice.13217

  2. Zhuang, Yong / Liu, Rengkui / Tang, Yuanjie (2024): Heterogeneity‐oriented ensemble learning for rail monitoring based on vehicle‐body vibration. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 39, n. 12 (mars 2024).

    https://doi.org/10.1111/mice.13146

  3. Hu, Zhiyuan / Wang, Futian / Tang, Yuanjie (2023): Scenario‐oriented repetitive project scheduling optimization. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 38, n. 10 (6 juin 2023).

    https://doi.org/10.1111/mice.12917

  4. Chang, Yanyan / Liu, Rengkui / Tang, Yuanjie (2023): Segment‐condition‐based railway track maintenance schedule optimization. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 38, n. 2 (février 2023).

    https://doi.org/10.1111/mice.12824

  5. Tang, Yuanjie / Sun, Quanxin / Liu, Rengkui / Wang, Futian (2018): Resource Leveling Based on Line of Balance and Constraint Programming. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 10 (septembre 2018).

    https://doi.org/10.1111/mice.12383

  6. Tang, Yuanjie / Liu, Rengkui / Wang, Futian / Sun, Quanxin / Kandil, Amr A. (2018): Scheduling Optimization of Linear Schedule with Constraint Programming. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 2 (février 2018).

    https://doi.org/10.1111/mice.12277

  7. Tang, Yuanjie / Liu, Rengkui / Sun, Quanxin (2014): Schedule control model for linear projects based on linear scheduling method and constraint programming. Dans: Automation in Construction, v. 37 (janvier 2014).

    https://doi.org/10.1016/j.autcon.2013.09.008

  8. Tang, Yuanjie / Liu, Rengkui / Sun, Quanxin (2014): Two-Stage Scheduling Model for Resource Leveling of Linear Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000862

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine