-
Tam, Vivian W. Y. / Tam, C. M. (2007): Assessment of durability of recycled aggregate concrete produced by two-stage mixing approach. Dans: Journal of Materials Science, v. 42, n. 10 (janvier 2007).
https://doi.org/10.1007/s10853-006-0379-y
-
Tam, Vivian W. Y. / Gao, X. F. / Tam, C. M. (2005): Carbonation around near aggregate regions of old hardened concrete cement paste. Dans: Cement and Concrete Research, v. 35, n. 6 (juin 2005).
https://doi.org/10.1016/j.cemconres.2004.07.042
-
Tam, C. M. / Zeng, S. X. / Tong, Thomas K. (2009): Conflict Analysis in Public Engagement Program of Urban Planning in Hong Kong. Dans: Journal of Urban Planning and Development, v. 135, n. 2 (juin 2009).
https://doi.org/10.1061/(asce)0733-9488(2009)135:2(51)
-
Tam, C. M. / Tong, Thomas K. L. / Tse, Sharon L. (2002): Artificial neural networks model for predicting excavator productivity. Dans: Engineering, Construction and Architectural Management, v. 9, n. 1 (janvier 2002).
https://doi.org/10.1108/eb021238
-
Chan, John K. W. / Tam, C. M. / Cheung, Ruby K. C. (2005): Construction firms at the crossroads in Hong Kong. Going insolvency or seeking opportunity. Dans: Engineering, Construction and Architectural Management, v. 12, n. 2 (avril 2005).
https://doi.org/10.1108/09699980510584476
-
Zhang, Hong / Tam, C. M. (2005): Consideration of break in modeling of construction processes. Dans: Engineering, Construction and Architectural Management, v. 12, n. 4 (août 2005).
https://doi.org/10.1108/09699980510608820
-
Tam, Vivian W. Y. / Shen, L. Y. / Tam, C. M. (2007): Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations. Dans: Building and Environment, v. 42, n. 3 (mars 2007).
https://doi.org/10.1016/j.buildenv.2005.12.023
-
Tam, Vivian W. Y. / Tam, C. M. / Zeng, S. X. / Chan, K. K. (2006): Environmental performance measurement indicators in construction. Dans: Building and Environment, v. 41, n. 2 (février 2006).
https://doi.org/10.1016/j.buildenv.2005.01.009
-
Leung, Arthur W. T. / Tam, C. M. / Liu, D. K. (2001): Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes. Dans: Building and Environment, v. 36, n. 4 (mai 2001).
https://doi.org/10.1016/s0360-1323(00)00029-9
-
Chan, Albert P. C. / Ho, Danny C. K. / Tam, C. M. (2001): Effect of Interorganizational Teamwork on Project Outcome. Dans: Journal of Management in Engineering (ASCE), v. 17, n. 1 (janvier 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:1(34)
-
Tam, C. M. / Tong, Thomas K. L. (2011): Conflict analysis study for public engagement programme in infrastructure planning. Dans: Built Environment Project and Asset Management, v. 1, n. 1 (juillet 2011).
https://doi.org/10.1108/20441241111143777
-
Tam, C. M. / Tam, Vivian W. Y. / Zeng, S. X. (2004): Environmental performance assessment in China and Hong Kong. Dans: Building Research & Information, v. 32, n. 2 ( 2004).
https://doi.org/10.1080/0961321032000132124
-
Tam, C. M. / Tam, Vivian W. Y. / Zeng, S. X. (2002): Environmental Performance Evaluation (EPE) for construction. Dans: Building Research & Information, v. 30, n. 5 ( 2002).
https://doi.org/10.1080/09613210210150964
-
Chan, Albert PC / Tam, C. M. (2001): Enhancing Project Performance through the Introduction of Safety Programs. Dans: Architectural Science Review, v. 44, n. 1 (mars 2001).
https://doi.org/10.1080/00038628.2001.9697449
-
Chan, Albert P. C. / Ho, Denny K. C. / Tam, C. M. (2001): Design and Build: Views from some Major Public Clients in Hong Kong. Dans: Australasian Journal of Construction Economics and Building, v. 1, n. 1 (septembre 2001).
https://doi.org/10.5130/ajceb.v1i1.2277
-
Tam, C. M. / Tong, Thomas K. L. / Lau, C. T. (2003): ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators. Dans: Construction Innovation, v. 3, n. 1 (mars 2003).
https://doi.org/10.1108/14714170310814846
-
Zhang, Hong / Tam, C. M. / Li, Heng (2005): Activity Object-Oriented Simulation Strategy for Modeling Construction Operations. Dans: Journal of Computing in Civil Engineering, v. 19, n. 3 (juillet 2005).
https://doi.org/10.1061/(asce)0887-3801(2005)19:3(313)
-
Zhang, Hong / Tam, C. M. / Shi, Jonathan Jingsheng (2003): Application of Fuzzy Logic to Simulation for Construction Operations. Dans: Journal of Computing in Civil Engineering, v. 17, n. 1 (janvier 2003).
https://doi.org/10.1061/(asce)0887-3801(2003)17:1(38)
-
Tam, Vivian W. Y. / Tam, C. M. (2007): Crushed aggregate production from centralized combined and individual waste sources in Hong Kong. Dans: Construction and Building Materials, v. 21, n. 4 (avril 2007).
https://doi.org/10.1016/j.conbuildmat.2005.12.016
-
Tam, Vivian W. Y. / Tam, C. M. (2008): Diversifying two-stage mixing approach (TSMA) for recycled aggregate concrete: TSMAs and TSMAsc. Dans: Construction and Building Materials, v. 22, n. 10 (octobre 2008).
https://doi.org/10.1016/j.conbuildmat.2007.07.024
-
Tam, C. M. / Tam, Vivian W. Y. / Ng, K. M. (2012): Assessing drying shrinkage and water permeability of reactive powder concrete produced in Hong Kong. Dans: Construction and Building Materials, v. 26 (janvier 2012).
https://doi.org/10.1016/j.conbuildmat.2011.05.006
-
Chan, Albert P. C. / Ho, Danny C. K. / Tam, C. M. (2001): Design and Build Project Success Factors: Multivariate Analysis. Dans: Journal of Construction Engineering and Management, v. 127, n. 2 (avril 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:2(93)
-
Deng, Z. M. / Li, H. / Tam, C. M. / Shen, Q. P. / Love, P. E. D. (2001): An application of the Internet-based project management system. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001).
https://doi.org/10.1016/s0926-5805(99)00037-0
-
Wong, C. K. / Fung, I. W. H. / Tam, C. M. (2010): Comparison of Using Mixed-Integer Programming and Genetic Algorithms for Construction Site Facility Layout Planning. Dans: Journal of Construction Engineering and Management, v. 136, n. 10 (octobre 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000214
-
Tam, C. M. / Tong, Thomas K. L. / Lau, Tony C. T. / Chan, K. K. (2004): Diagnosis of prestressed concrete pile defects using probabilistic neural networks. Dans: Engineering Structures, v. 26, n. 8 (juillet 2004).
https://doi.org/10.1016/j.engstruct.2004.03.018
-
Tam, V. W.-Y. / Gao, X.-F. / Tam, C. M. (2006): Comparing performance of modified two-stage mixing approach for producing recycled aggregate concrete. Dans: Magazine of Concrete Research, v. 58, n. 7 (septembre 2006).
https://doi.org/10.1680/macr.2006.58.7.477
-
Tam, Vivian W. Y. / Tam, C. M. / Yiu, Kenneth T. W. / Cheung, S. O. (2006): Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Dans: Construction Management and Economics, v. 24, n. 11 (novembre 2006).
https://doi.org/10.1080/01446190600799620
-
Tam, Vivian W. Y. / Tam, C. M. / Shen, L. Y. / Zeng, S. X. / Ho, C. M. (2006): Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators. Dans: Construction Management and Economics, v. 24, n. 3 (mars 2006).
https://doi.org/10.1080/01446190500372197
-
Chan, Albert P. C. / Yung, Esther H. K. / Lam, Patrick T. I. / Tam, C. M. / Cheung, S. O. (2001): Application of Delphi method in selection of procurement systems for construction projects. Dans: Construction Management and Economics, v. 19, n. 7 (novembre 2001).
https://doi.org/10.1080/01446190110066128
-
Tam, C. M. / Fung, Ivan W. H. (1998): Effectiveness of safety management strategies on safety performance in Hong Kong. Dans: Construction Management and Economics, v. 16, n. 1 (janvier 1998).
https://doi.org/10.1080/014461998372583