Bassam M. Tahir
- Planning and scheduling concrete repair work — A case study. Case study of contractors' errors in scheduling concrete repairs, exemplar for overcoming slippage. Dans: Building Research & Information, v. 24, n. 6 ( 1996). (1996):
- Use of microsilica in concrete construction. Reviews state‐of‐the‐art silica fume concrete and discusses the influence silica fume has on the various properties of concrete and the effect on the bond between parent concrete and new concrete. Dans: Building Research & Information, v. 24, n. 1 ( 1996). (1996):
- A concrete pier: case history of failure and repair. Dans: Construction and Building Materials, v. 14, n. 1 (février 2000). (2000):
- Evaluation and Rehabilitation of Concrete Pier. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 11, n. 3 (août 1997). (1997):