-
Abanda, F. H. / Vidalakis, C. / Oti, A. H. / Tah, J. H. M. (2015): A critical analysis of Building Information Modelling systems used in construction projects. Dans: Advances in Engineering Software, v. 90 (décembre 2015).
https://doi.org/10.1016/j.advengsoft.2015.08.009
-
Tah, J. H. M. / Carr, V. / Howes, R. (1999): Information modelling for case-based construction planning of highway bridge projects. Dans: Advances in Engineering Software, v. 30, n. 7 (juillet 1999).
https://doi.org/10.1016/s0965-9978(98)00128-8
-
Wirba, E. N. / Tah, J. H. M. / Howes, R. (1996): Risk interdependencies and natural language computations. Dans: Engineering, Construction and Architectural Management, v. 3, n. 4 (avril 1996).
https://doi.org/10.1108/eb021034
-
Tah, J. H. M. / Carr, V. / Howes, R. (1998): An application of case‐based reasoning to the planning of highway bridge construction. Dans: Engineering, Construction and Architectural Management, v. 5, n. 4 (avril 1998).
https://doi.org/10.1108/eb021086
-
Tah, J. H. M. / Carr, V. (2000): Information modelling for a construction project risk management system. Dans: Engineering, Construction and Architectural Management, v. 7, n. 2 (février 2000).
https://doi.org/10.1108/eb021136
-
Ugwu, O. O. / Tah, J. H. M. (2002): Development and application of a hybrid genetic algorithm for resource optimization and management. Dans: Engineering, Construction and Architectural Management, v. 9, n. 4 (avril 2002).
https://doi.org/10.1108/eb021225
-
Tah, J. H. M. / Price, A. D. F. (2008): A Data Base Management System (DBMS) for Formwork Design Applications. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 5, n. 1 (novembre 2008).
https://doi.org/10.1111/j.1467-8667.1990.tb00041.x
-
Tah, J. H. M. / Oti, A. H. / Abanda, F. H. (2018): A state-of-the-art review of built environment information modelling (BeIM). Dans: Organization, Technology and Management in Construction, v. 9, n. 1 (décembre 2018).
https://doi.org/10.1515/otmcj-2016-0030
-
Abanda, F. H. / Tah, J. H. M. / Cheung, F. K. T. (2013): Mathematical modelling of embodied energy, greenhouse gases, waste, time–cost parameters of building projects: A review. Dans: Building and Environment, v. 59 (janvier 2013).
https://doi.org/10.1016/j.buildenv.2012.07.014
-
Tah, J. H. M. / Price, A. D. F. (1991): Computer-based modelling of concrete pressures on complex shaped wall formwork. Dans: Building and Environment, v. 26, n. 2 (janvier 1991).
https://doi.org/10.1016/0360-1323(91)90030-f
-
Tah, J. H. M. / Price, A. D. F. (1991): Interactive computer-aided formwork design. Dans: Computers & Structures, v. 41, n. 6 (janvier 1991).
https://doi.org/10.1016/0045-7949(91)90253-i
-
Tah, J. H. M. / Carr, V. (2001): Knowledge-Based Approach to Construction Project Risk Management. Dans: Journal of Computing in Civil Engineering, v. 15, n. 3 (juillet 2001).
https://doi.org/10.1061/(asce)0887-3801(2001)15:3(170)
-
Oti, A. H. / Tah, J. H. M. / Abanda, F. H. (2018): Integration of Lessons Learned Knowledge in Building Information Modeling. Dans: Journal of Construction Engineering and Management, v. 144, n. 9 (septembre 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001537
-
Dikmen, I. / Birgonul, M. T. / Anac, C. / Tah, J. H. M. / Aouad, G. (2008): Learning from risks: A tool for post-project risk assessment. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008).
https://doi.org/10.1016/j.autcon.2008.04.008
-
Oti, A. H. / Kurul, E. / Cheung, F. / Tah, J. H. M. (2016): A framework for the utilization of Building Management System data in building information models for building design and operation. Dans: Automation in Construction, v. 72 (décembre 2016).
https://doi.org/10.1016/j.autcon.2016.08.043
-
Oti, A. H. / Tizani, W. / Abanda, F. H. / Jaly-Zada, A. / Tah, J. H. M. (2016): Structural sustainability appraisal in BIM. Dans: Automation in Construction, v. 69 (septembre 2016).
https://doi.org/10.1016/j.autcon.2016.05.019
-
Tah, J. H. M. / Carr, V. (2000): A proposal for construction project risk assessment using fuzzy logic. Dans: Construction Management and Economics, v. 18, n. 4 (juin 2000).
https://doi.org/10.1080/01446190050024905
-
Poh, Y. P. / Tah, J. H. M. (2006): Integrated duration–cost influence network for modelling risk impacts on construction tasks. Dans: Construction Management and Economics, v. 24, n. 8 (août 2006).
https://doi.org/10.1080/01446190600658891
-
Tah, J. H. M. / Thorpe, A. / McCaffer, R. (1994): A survey of indirect cost estimating in practice. Dans: Construction Management and Economics, v. 12, n. 1 (janvier 1994).
https://doi.org/10.1080/01446199400000004
-
Abanda, F. H. / Oti, A. H. / Tah, J. H. M. (2017): Integrating BIM and new rules of measurement for embodied energy and CO 2 assessment. Dans: Journal of Building Engineering, v. 12 (juillet 2017).
https://doi.org/10.1016/j.jobe.2017.06.017
-
Abanda, F. H. / Tah, J. H. M. / Cheung, F. K. T. (2017): BIM in off-site manufacturing for buildings. Dans: Journal of Building Engineering, v. 14 (novembre 2017).
https://doi.org/10.1016/j.jobe.2017.10.002