0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Hosein Taghaddos ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Mansouri, Ali / Taghaddos, Hosein / Nekouvaght Tak, Ala / Sadatnya, Amir / Aghajamali, Kamyab (2024): Simulation-based planning of earthmoving equipment for reducing greenhouse gas (GHG) emissions. Dans: Automation in Construction, v. 168 (décembre 2024).

    https://doi.org/10.1016/j.autcon.2024.105841

  2. Zamani, Vahid / Yavari, Ehsan / Taghaddos, Hosein (2024): A science mapping lens on discrete event simulation applications in construction engineering and management. Dans: Automation in Construction, v. 166 (octobre 2024).

    https://doi.org/10.1016/j.autcon.2024.105625

  3. Zamani, Vahid / Taghaddos, Hosein / Gholipour, Yaghob (2023): Sensor-fused simulation-based decision support system for earthmoving projects. Dans: Automation in Construction, v. 156 (décembre 2023).

    https://doi.org/10.1016/j.autcon.2023.105117

  4. Aghajamali, Kamyab / Nekouvaght Tak, Ala / Taghaddos, Hosein / Mousaei, Ali / Behzadipour, Saeed / Hermann, Ulrich (2023): Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites. Dans: Journal of Construction Engineering and Management, v. 149, n. 7 (juillet 2023).

    https://doi.org/10.1061/jcemd4.coeng-13109

  5. Mousaei, Ali / Taghaddos, Hosein / Bagheri, S. Marzieh / Hermann, Ulrich (2021): Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002157

  6. Taghaddos, Hosein / Hermann, Ulrich / AbouRizk, Simaan / Mohamed, Yasser (2014): Simulation-Based Multiagent Approach for Scheduling Modular Construction. Dans: Journal of Computing in Civil Engineering, v. 28, n. 2 (mars 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000262

  7. Hu, Di / Mohamed, Yasser / Taghaddos, Hosein / Hermann, Ulrich (Rick) (2017): A simulation-based method for effective workface planning of industrial construction projects. Dans: Construction Management and Economics, v. 36, n. 6 (octobre 2017).

    https://doi.org/10.1080/01446193.2017.1390241

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine