- Towards the adoption of most suitable green walls within sustainable buildings using interval type-2 fuzzy best-worst method and TOPSIS technique. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022). (2022):
- Towards the Development of a Comprehensive Lifecycle Risk Assessment Model for Green Roof Implementation. Dans: Sustainable Cities and Society, v. 76 (janvier 2022). (2022):
- Deterrents to the adoption of green walls: a hybrid fuzzy-based approach. Dans: Engineering, Construction and Architectural Management, v. 29, n. 9 (août 2022). (2022):
- Towards the success of Building Information Modelling implementation: A fuzzy-based MCDM risk assessment tool. Dans: Journal of Building Engineering, v. 43 (novembre 2021). (2021):
- A prototype decision support system for green roof type selection: A cybernetic fuzzy ANP method. Dans: Sustainable Cities and Society, v. 48 (juillet 2019). (2019):
- Identifying and assessing the critical criteria affecting decision-making for green roof type selection. Dans: Sustainable Cities and Society, v. 39 (mai 2018). (2018):