Chuanbing Sun
- Value Engineering Arbor Road Bridge with Curved Precast Concrete Girders. Dans: PCI Journal, v. 52, n. 2 (mars 2007). (2007):
- Nebraska Precast Record: 204th Street Bridge Spans Single-Point Interchange. Dans: PCI Journal, v. 51, n. 6 (novembre 2006). (2006):
- Value Engineering in Practice: A Look at the Clarks Viaduct in Nebraska. Dans: PCI Journal, v. 50, n. 5 (septembre 2005). (2005):
- High Performance Precast Concrete NUDECK Panel System for Nebraska's Skyline Bridge. Dans: PCI Journal, v. 49, n. 5 (septembre 2004). (2004):
- Prestressed Concrete Box Girders Made from Precast Concrete Unsymmetrical Sections. Dans: PCI Journal, v. 49, n. 1 (janvier 2004). (2004):
- Application of the Strength Design Method for Flexural Members at Prestress Transfer. Dans: PCI Journal, v. 48, n. 5 (septembre 2003). (2003):