Kangsuk Suh
- Scheduling system for repetitive unit construction using line‐of‐balance technology. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- Challenges in Line-of-Balance Scheduling. Dans: Journal of Construction Engineering and Management, v. 128, n. 6 (décembre 2002). (2002):