Meirong Su
- An estimation of ecological risk after dam construction in LRGR, China: Changes on heavy metal pollution and plant distribution. Dans: Procedia Environmental Sciences, v. 5 ( 2011). (2011):
- Evaluation of the changed properties of aquatic animals after dam construction using ecological network analysis. Dans: Procedia Environmental Sciences, v. 5 ( 2011). (2011):
- The cumulative effects of dam project on river ecosystem based on multi-scale ecological network analysis. Dans: Procedia Environmental Sciences, v. 5 ( 2011). (2011):