Mungo Stacy
- Viewpoint: Data and decisions for bridge maintenance. Dans: The Structural Engineer, v. 101, n. 9 (septembre 2023). (2023):
- Future Ready case studies. Dans: Hormigón y acero, v. 71, n. 292 (septembre 2020). (2020):
- Refurbishment of structures on the Manchester Metrolink phase 3. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 167, n. 3 (septembre 2014). (2014):