- Cost Optimization of Multiunit Construction Projects Using Linear Programming and Metaheuristic-Based Simulated Annealing Algorithm. Dans: Journal of Civil Engineering and Management, v. 25, n. 8 (décembre 2019). (2019):
- An Exact Solution for the Resource-constrained Construction Scheduling Problem. Dans: Engineering Structures and Technologies, v. 8, n. 2 (juillet 2016). (2016):