Jaeho Son
- New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities. Dans: Journal of Asian Architecture and Building Engineering, v. 14, n. 2 (mai 2015). (2015):
- A System Model for Analyzing and Accumulating Construction Work Crew′s Productivity Data Using Image Processing Technologies. Dans: Journal of Asian Architecture and Building Engineering, v. 13, n. 3 (septembre 2014). (2014):
- Developing a Process Model for Optimizing Linear Process Plans Based on Three Types of Buffers and Brute-Force Algorithm. Dans: Journal of Asian Architecture and Building Engineering, v. 15, n. 2 (mai 2016). (2016):
- A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013). (2013):
- Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. Dans: Journal of Construction Engineering and Management, v. 125, n. 1 (janvier 1999). (1999):
- Binary Resource Leveling Model: Activity Splitting Allowed. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004). (2004):
- Determination of Haul Distance and Direction in Mass Excavation. Dans: Journal of Construction Engineering and Management, v. 131, n. 3 (mars 2005). (2005):
- Nonlinear cash flow optimization model. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 11 (novembre 2006). (2006):
- Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 3 (mars 2008). (2008):