Shuichi Soda
- Control And Inspection On Field Welding Work Of The Fabrication Of Curved Members At The Air-side Bridge. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 427 (mars 1991). (1991):
- Improvement Of Surface Treatment Procedure In Concrete Pavements For Bonded Concrete Overlay. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1992, n. 451 ( 1992). (1992):
- Structural Design Of Airport Concrete Pavement On Soft Ground With Differential Settlement. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1992, n. 451 ( 1992). (1992):
- Development Of Lift-up Method For Prestressed Concrete Pavements. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 498 (septembre 1994). (1994):
- Observation of Differential Settlement in Offshore Development Project of Tokyo International Airport. Dans: Soils and Foundations, v. 33, n. 2 (juin 1993). (1993):