0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Miroslaw J. Skibniewski

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Protest Denied: A Qualitative Meta-Analysis of Failed Challenges to Government Contracting. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (mai 2023).

    https://doi.org/10.1061/jladah.ladr-925

  2. Kim, Young Joo / Skibniewski, Miroslaw J. (2023): Optimism Bias in Bidding: Contractors’ Horizontally Biased Estimating Behavior. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (mai 2023).

    https://doi.org/10.1061/jladah.ladr-845

  3. Ding, Liping / Wu, Xianguo / Zhang, Limao / Skibniewski, Miroslaw J. (2015): How to protect historical buildings against tunnel-induced damage: A case study in China. Dans: Journal of Cultural Heritage, v. 16, n. 6 (novembre 2015).

    https://doi.org/10.1016/j.culher.2015.03.001

  4. Zhang, Limao / Wu, Xianguo / Ding, Lieyun / Skibniewski, Miroslaw J. (2013): A novel model for risk assessment of adjacent buildings in tunneling environments. Dans: Building and Environment, v. 65 (juillet 2013).

    https://doi.org/10.1016/j.buildenv.2013.04.008

  5. Zhang, Limao / Liu, Qian / Wu, Xianguo / Skibniewski, Miroslaw J. (2016): Perceiving Interactions on Construction Safety Behaviors: Workers’ Perspective. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000454

  6. Chen, Jieh-Haur / Hsu, Shu-Chien / Luo, Yung-Hong / Skibniewski, Miroslaw J. (2012): Knowledge Management for Risk Hedging by Construction Material Suppliers. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000111

  7. Golden, Sabrina K. / Skibniewski, Miroslaw J. (2010): Immigration and Construction: Analysis of the Impact of Immigration on Construction Project Costs. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 4 (octobre 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000021

  8. Yuan, Jingfeng / Skibniewski, Miroslaw J. / Li, Qiming / Zheng, Lei (2010): Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 2 (avril 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000011

  9. Ju, Qianqian / Ding, Lieyun / Skibniewski, Miroslaw J. (2017): Optimization strategies to eliminate interface conflicts in complex supply chains of construction projects. Dans: Journal of Civil Engineering and Management, v. 23, n. 6 (juin 2017).

    https://doi.org/10.3846/13923730.2016.1232305

  10. Liu, Hui / Skibniewski, Miroslaw J. / Wang, Mengjun (2016): Identification and Hierarchical Structure of Critical Success Factors for Innovation in Construction Projects: Chinese Perspective. Dans: Journal of Civil Engineering and Management, v. 22, n. 3 (mars 2016).

    https://doi.org/10.3846/13923730.2014.975739

  11. Abduh, Muhamad / Skibniewski, Miroslaw J. (2002): Optimal Configuration of Electronic Networking Technologies for Supporting D/B projects. Dans: Journal of Civil Engineering and Management, v. 8, n. 4 (décembre 2002).

    https://doi.org/10.3846/13923730.2002.10531284

  12. Zhang, Limao / Wu, Xianguo / Liu, Wenli / Skibniewski, Miroslaw J. (2019): Optimal Strategy to Mitigate Tunnel-Induced Settlement in Soft Soils: Simulation Approach. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 5 (octobre 2019).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001322

  13. Guo, Shengyu / Ding, Lieyun / Zhang, Yongcheng / Skibniewski, Miroslaw J. / Liang, Kongzheng (2019): Hybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry. Dans: Journal of Construction Engineering and Management, v. 145, n. 6 (juin 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001665

  14. Zhou, Cheng / Ding, Lieyun / Zhou, Ying / Zhang, Hantao / Skibniewski, Miroslaw J. (2019): Hybrid Support Vector Machine Optimization Model for Prediction of Energy Consumption of Cutter Head Drives in Shield Tunneling. Dans: Journal of Computing in Civil Engineering, v. 33, n. 3 (mai 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000833

  15. Russell, Jeffrey S. / Skibniewski, Miroslaw J. (1990): QUALIFIER‐1: Contractor Prequalification Model. Dans: Journal of Computing in Civil Engineering, v. 4, n. 1 (janvier 1990).

    https://doi.org/10.1061/(asce)0887-3801(1990)4:1(77)

  16. Russell, Jeffrey S. / Skibniewski, Miroslaw J. / Cozier, David R. (1990): Qualifier‐2: Knowledge‐Based System for Contractor Prequalification. Dans: Journal of Construction Engineering and Management, v. 116, n. 1 (mars 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:1(157)

  17. Murtaza, Mirza B. / Fisher, Deborah J. / Skibniewski, Miroslaw J. (1993): Knowledge‐Based Approach to Modular Construction Decision Support. Dans: Journal of Construction Engineering and Management, v. 119, n. 1 (mars 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:1(115)

  18. Chao, Li‐Chung / Skibniewski, Miroslaw J. (1995): Neural Network Method of Estimating Construction Technology Acceptability. Dans: Journal of Construction Engineering and Management, v. 121, n. 1 (mars 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:1(130)

  19. Son, Jaeho / Skibniewski, Miroslaw J. (1999): Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. Dans: Journal of Construction Engineering and Management, v. 125, n. 1 (janvier 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:1(23)

  20. Chao, Li‐Chung / Skibniewski, Miroslaw J. (1998): Fuzzy Logic for Evaluating Alternative Construction Technology. Dans: Journal of Construction Engineering and Management, v. 124, n. 4 (juillet 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:4(297)

  21. Skibniewski, Miroslaw J. / Tamaki, Kinya (1994): Logistics Support System for Construction Robotics Implementation. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (janvier 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00363.x

  22. Skibniewski, Miroslaw J. / Kunigahalli, Raghavan / Russell, Jeffrey S. (1993): Managing multiple construction robots with a computer. Dans: Automation in Construction, v. 2, n. 3 (décembre 1993).

    https://doi.org/10.1016/0926-5805(93)90041-u

  23. Kunigahalli, Raghavan / Russel, Jeffrey S. / Skibniewski, Miroslaw J. (1994): Motion planning for automated construction. Dans: Automation in Construction, v. 3, n. 1 (mai 1994).

    https://doi.org/10.1016/0926-5805(94)90034-5

  24. Yu, Wen-der / Skibniewski, Miroslaw J. (1999): A neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation. Dans: Automation in Construction, v. 8, n. 5 (juin 1999).

    https://doi.org/10.1016/s0926-5805(98)00104-6

  25. Yu, Wen-der / Skibniewski, Miroslaw J. (1999): Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system. Dans: Automation in Construction, v. 8, n. 5 (juin 1999).

    https://doi.org/10.1016/s0926-5805(98)00105-8

  26. Yuan, Jingfeng / Zeng, Alex Yajun / Skibniewski, Miroslaw J. / Li, Qiming (2009): Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Dans: Construction Management and Economics, v. 27, n. 3 (mars 2009).

    https://doi.org/10.1080/01446190902748705

  27. Skibniewski, Miroslaw J. / Kassouf, Paul J. (1990): Potential for application of plastic liner plates in tunnelling works. Dans: Construction Management and Economics, v. 8, n. 1 (mars 1990).

    https://doi.org/10.1080/01446199000000002

  28. Skibniewski, Miroslaw J. (1991): Information management system for new construction technologies. Dans: Construction Management and Economics, v. 9, n. 1 (février 1991).

    https://doi.org/10.1080/01446199100000004

  29. Lee, Yong-Seon / Jang, Won-Suk / Skibniewski, Miroslaw J. (2009): Noise Evaluation for Pavement Maintenance in Metropolitan Highway Bridges. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 3 (juin 2009).

    https://doi.org/10.1061/(asce)0887-3828(2009)23:3(181)

  30. Golden, Sabrina K. / Skibniewski, Miroslaw J. (2009): Immigration and Construction: The Makeup of the Workforce in the Washington, D.C., Metropolitan Area. Dans: Journal of Construction Engineering and Management, v. 135, n. 9 (septembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000058

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine