- Shaking Table Test and Numerical Simulation for Dynamic Response of Shallow-Buried Bias Double-Arch tunnel. Dans: Geotechnical and Geological Engineering, v. 38, n. 4 (23 mars 2020). (2020):
- Influence of Construction Process of Double-Line Shield Tunnel Crossing Frame Structure on Ground Settlement. Dans: Geotechnical and Geological Engineering, v. 38, n. 2 (20 décembre 2019). (2019):