Aviad Shapira
- Tower Crane Cycle Times: Case Study of Remote-Control versus Cab-Control Operation. Dans: Journal of Construction Engineering and Management, v. 140, n. 12 (décembre 2014). (2014):
- "Soft" Considerations in Equipment Selection for Building Construction Projects. Dans: Journal of Construction Engineering and Management, v. 133, n. 10 (octobre 2007). (2007):
- Stabilizing Production Flow of Interior and Finishing Works with Reentrant Flow in Building Construction. Dans: Journal of Construction Engineering and Management, v. 139, n. 6 (juin 2013). (2013):
- VR-based planning of construction site activities. Dans: Automation in Construction, v. 8, n. 6 (août 1999). (1999):
- Vision System for Tower Cranes. Dans: Journal of Construction Engineering and Management, v. 134, n. 5 (mai 2008). (2008):
- Work Inputs and Related Economic Aspects of Multitier Shoring Towers. Dans: Journal of Construction Engineering and Management, v. 130, n. 1 (février 2004). (2004):
- Systematic Evaluation of Construction Equipment Alternatives: Case Study. Dans: Journal of Construction Engineering and Management, v. 133, n. 1 (janvier 2007). (2007):
- Work-input model for assembly and disassembly of high shoring towers. Dans: Construction Management and Economics, v. 18, n. 4 (juin 2000). (2000):
- A workflow model for systems and interior finishing works in building construction. Dans: Construction Management and Economics, v. 29, n. 12 (décembre 2011). (2011):
- Selection of mobile cranes for building construction projects. Dans: Construction Management and Economics, v. 17, n. 4 (juillet 1999). (1999):
- Windmill Erection and Maintenance: Challenges for Crane Design. Dans: Journal of Construction Engineering and Management, v. 137, n. 10 (octobre 2011). (2011):