Paul R. Schroeder
- Chemical Clarification of Dredged Material. Dans: Journal of Environmental Engineering (ASCE), v. 109, n. 2 (avril 1983). (1983):
- Residence Time Distributions of Shallow Basins. Dans: Journal of Environmental Engineering (ASCE), v. 113, n. 6 (décembre 1987). (1987):
- Field Verification of HELP Model for Landfills. Dans: Journal of Environmental Engineering (ASCE), v. 114, n. 2 (avril 1988). (1988):
- Leachate Collection in Landfills: Steady Case. Dans: Journal of Environmental Engineering (ASCE), v. 114, n. 5 (octobre 1988). (1988):
- Evaluation of Landfill‐Liner Designs. Dans: Journal of Environmental Engineering (ASCE), v. 116, n. 3 (mai 1990). (1990):
- Contaminant Leaching Model for Dredged Material Disposal Facilities. Dans: Journal of Environmental Engineering (ASCE), v. 125, n. 9 (septembre 1999). (1999):
- Retardation of Dredged Material Leachate in Foundation Soils. Dans: Journal of Environmental Engineering (ASCE), v. 130, n. 12 (décembre 2004). (2004):
- Settlement of Dredged and Contaminated Material Placement Areas. I: Theory and Use of Primary Consolidation, Secondary Compression, and Desiccation of Dredged Fill. Dans: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 131, n. 2 (mars 2005). (2005):
- Settlement of Dredged and Contaminated Material Placement Areas. II: Primary Consolidation, Secondary Compression, and Desiccation of Dredged Fill Input Parameters. Dans: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 131, n. 2 (mars 2005). (2005):