Karl Schiesser
- Metro Doha Green Line: Fibre reinforced tunnel linings – Design and construction experience. Dans: Geomechanics and Tunnelling, v. 14, n. 4 (août 2021). (2021):
- Ground pressure-dependent segment opening options for cross passages on Koralm Tunnel contract KAT3 - Development of support types for cross passage excavation to segment-lined tunnel. Dans: Geomechanics and Tunnelling, v. 12, n. 1 (février 2019). (2019):
- New Vienna-St. Pölten Railway Line, Perschling Tunnels – Design and preparatory works for the combination of TBM, NATM and cut-and-cover construction methods. Dans: Felsbau, v. 25, n. 2 ( 2007). (2007):