Vincent Schiavone
- Application of the maturity model for collaborative scheduling for construction projects. Dans: Engineering, Construction and Architectural Management. :
- The gold standard: developing a maturity model to assess collaborative scheduling. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022). (2022):
- Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. Dans: Journal of Construction Engineering and Management, v. 145, n. 12 (décembre 2019). (2019):