Cliff Schexnayder
- Risk Analysis of Connecticut Department of Transportation Projects during the COVID-19 Pandemic. Dans: Practice Periodical on Structural Design and Construction, v. 29, n. 3 (août 2024). (2024):
- Synthesis of Performance Measures for Highway Cost Estimating. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014). (2014):
- Probability Distribution Functions for Construction Simulation. Dans: Journal of Construction Engineering and Management, v. 126, n. 4 (juillet 2000). (2000):
- Strategies for Planned Project Acceleration. Dans: Journal of Construction Engineering and Management, v. 137, n. 5 (mai 2011). (2011):
- Praeludium to the 50th Anniversary Special Issue. Dans: Journal of Construction Engineering and Management, v. 133, n. 9 (septembre 2007). (2007):
- Solving Critical Lifts Utilizing 3D Modeling Software. Dans: Practice Periodical on Structural Design and Construction, v. 20, n. 3 (août 2015). (2015):
- Placing Winter Concrete: Pearl Harbor Memorial Bridge. Dans: Practice Periodical on Structural Design and Construction, v. 20, n. 3 (août 2015). (2015):
- Rammed Earth: Construction Lessons from Experience. Dans: Practice Periodical on Structural Design and Construction, v. 18, n. 3 (août 2013). (2013):
- Tunnel Boring Machines. Dans: Practice Periodical on Structural Design and Construction, v. 8, n. 3 (août 2003). (2003):
- The Pursuit and Sharing of Knowledge. Dans: Journal of Construction Engineering and Management, v. 143, n. 9 (septembre 2017). (2017):