Jaime Santa Cruz Astorqui
- Ventilated Façade with double chamber and flow control device. Dans: Energy and Buildings, v. 149 (août 2017). (2017):
- Eco plaster mortars with addition of waste for high hardness coatings. Dans: Construction and Building Materials, v. 158 (janvier 2018). (2018):
- (2017): Valorization of Building Retrofitting Waste as Alternative Materials in Gypsums. Dans: The Open Construction and Building Technology Journal, v. 11, n. 1 (décembre 2017).
- (2002): Nuevos elementos prefabricados de escayola aligerada para particiones y trasdosados. New prefabricated elements of lightened plaster used for partitions and extrados. Dans: Informes de la Construcción, v. 53, n. 477 (février 2002).
- (2003): La fotogrametría digital en el levantamiento de planos de edificios. Digitalphotogrametry in the plan suwey ofbuildings. Dans: Informes de la Construcción, v. 55, n. 488 (décembre 2003).
- (2005): Morteros aligerados con arcilla expandida: influencia de la granulometría y la adicción de fibras de vidrio ar en el comportamiento mecánico. Lightweight expanded clay mortars: effect of particle size distribution and ar fibreglass fibre additions on mechanical performance. Dans: Informes de la Construcción, v. 57, n. 497 (juin 2005).
- Viability of Gypsum Composites with Addition of Glass Waste for Applications in Construction. Dans: Journal of Materials in Civil Engineering (ASCE), v. 31, n. 3 (mars 2019). (2019):
- (2002): Study of the cultural heritage of the Echo valley, Huesca: the roman road Zaragoza-Bearne and the tower of Ysil. Dans: Informes de la Construcción, v. 54, n. 480 (août 2002).
- Viability analysis and constructive applications of lightened mortar (rubber cement mortar). Dans: Construction and Building Materials, v. 21, n. 8 (août 2007). (2007):
- Finite element simulation to design constructive elements: An application to light gypsum plaster for partitions. Dans: Construction and Building Materials, v. 23, n. 1 (janvier 2009). (2009):
- Fissure analysis in one-directional slabs with on-site concrete rib by continuous formwork. Dans: Construction and Building Materials, v. 23, n. 7 (juillet 2009). (2009):