Ossama M. Salem
- Lean Techniques in the Management of the Design of an Industrial Project. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 2 (avril 2012). (2012):
- Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012). (2012):
- Soil Penetration Modeling in Microtunneling Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 6 (juin 2006). (2006):
- Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 2 (février 2004). (2004):
- Productivity Analysis for Boulac's Wastewater Microtunnels in Egypt. Dans: Practice Periodical on Structural Design and Construction, v. 9, n. 2 (mai 2004). (2004):