Junji Sakimoto
- Results Of Observation And Simulation Of Deep Excavation For The Foundation 1a Anchorage Of Akashi-kaikyo Bridge. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 474 (septembre 1993). (1993):
- In-situ Loading Tests Of Diaphragm Wall Foundation And Property Of Its Bearing Capacity. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 546 (septembre 1996). (1996):
- New Method Of Predicting Penetration Resistance Of Skirt-suction Foundations And Its Verification Through Field Observation. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2004, n. 757 (mars 2004). (2004):
- 場所打ちライニング工法によるシールドトンネル覆工工事. Shield Tunnel Lining Construction By Cast-in-place Concrete Lining Method. Dans: Concrete Journal (JCI), v. 19, n. 8 ( 1981). (1981):
- Results of monitoring and simulation analyses for deep excavation. Présenté pendant: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998. (1998):