0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Safapour, Elnaz / Kermanshachi, Sharareh / Rouhanizadeh, Behzad (2022): Key components of successful post–hurricane reconstruction of transportation infrastructures. Dans: Built Environment Project and Asset Management, v. 12, n. 5 (10 août 2022).

    https://doi.org/10.1108/bepam-05-2021-0071

  2. Safapour, Elnaz / Kermanshachi, Sharareh / Taneja, Piyush / Pamidimukkala, Apurva (2022): Exploratory Analysis of Human-, Organizational-, and Project-Based Reworks: Challenges and Strategies. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 1 (février 2022).

    https://doi.org/10.1061/(asce)la.1943-4170.0000524

  3. Safapour, Elnaz / Kermanshachi, Sharareh / Jafari, Amirhosein (2022): Investigating Implementation Level of Phase-Based Strategies in Transportation Infrastructure Projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 5 (mai 2022).

    https://doi.org/10.1139/cjce-2021-0026

  4. Safapour, Elnaz / Kermanshachi, Sharareh / Kamalirad, Shirin / Tran, Dan (2019): Identifying Effective Project-Based Communication Indicators within Primary and Secondary Stakeholders in Construction Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 4 (novembre 2019).

    https://doi.org/10.1061/(asce)la.1943-4170.0000332

  5. Safapour, Elnaz / Kermanshachi, Sharareh / Kamalirad, Shirin (2021): Analysis of effective project-based communication components within primary stakeholders in construction industry. Dans: Built Environment Project and Asset Management, v. 11, n. 2 (avril 2021).

    https://doi.org/10.1108/bepam-02-2020-0026

  6. Kermanshachi, Sharareh / Safapour, Elnaz / Anderson, Stuart D. / Goodrum, Paul / Taylor, Timothy R. B. (2020): Establishment of Effective Project Scoping Process for Highway and Bridge Construction Projects. Dans: Practice Periodical on Structural Design and Construction, v. 25, n. 2 (mai 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000427

  7. Kermanshachi, Sharareh / Safapour, Elnaz (2020): Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment. Dans: Practice Periodical on Structural Design and Construction, v. 25, n. 1 (février 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000460

  8. Safapour, Elnaz / Kermanshachi, Sharareh (2019): Identifying Early Indicators of Manageable Rework Causes and Selecting Mitigating Best Practices for Construction. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 2 (mars 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000669

  9. Kermanshachi, Sharareh / Safapour, Elnaz (2019): Identification and Quantification of Project Complexity From Perspective of Primary Stakeholders in Us Construction Projects. Dans: Journal of Civil Engineering and Management, v. 25, n. 4 (juillet 2019).

    https://doi.org/10.3846/jcem.2019.8633

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine