0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Russell, Helena (2023): Eden Project Dundee – bringing regenerative aspirations to life. Dans: The Structural Engineer, v. 101, n. 8 (août 2023).

    https://doi.org/10.56330/jqwy9862

  2. Russell, Helena (2023): Interview: Roy Fishwick. Dans: The Structural Engineer, v. 101, n. 3 (mars 2023).

    https://doi.org/10.56330/luar1199

  3. Debell, Lotte / Russell, Helena (2014): Footbridge 2014 - Past, Present & Future. 5th International Conference. Hemming Information Services, Londres (Royaume-Uni).
  4. Russell, Helena (2010): Delegates hear of Forth Crossing schedule. Dans: Bridge Design & Engineering, v. 16, n. 59 (2e trimestre 2010).
  5. Russell, Helena (2010): From small beginnings. Extensive experience is not always a necessary requirement for engineers wanting to make a difference in developing countries. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010).
  6. Russell, Helena (2010): Aiming high. One man's five year adventure tracking down the world's highest bridges has culminated in the launch of a fascinating website. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010).
  7. Russell, Helena (2009): Back to basics. London's most famous bridge is getting a new coat of paint in time for the 2012 Olympics. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009).
  8. Russell, Helena (2009): Factor of change. For bridge engineers working in Europe, March 2010 markks a significant date in terms of working practice. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009).
  9. Russell, Helena (2009): Big Bay Build. With the erection of temporary works for San Francisco's new self-anchored suspension span progressing, the contractor is ramping up for delivery of the first desctions of deck. Dans: Bridge Design & Engineering, v. 15, n. 57 (4e trimestre 2009).
  10. Russell, Helena (2009): In the public eye. Dans: Bridge Design & Engineering, v. 15, n. 54 (1er trimestre 2009).
  11. Russell, Helena (2008): Design competitions under fire in Porto. Dans: Bridge Design & Engineering, v. 14, n. 52 (3e trimestre 2008).
  12. Russell, Helena (2008): Burning issue. Dans: Bridge Design & Engineering, v. 14, n. 50 (1er trimestre 2008).
  13. Russell, Helena (2008): Expo extravaganza. Dans: Bridge Design & Engineering, v. 14, n. 50 (1er trimestre 2008).
  14. Russell, Helena (2007): Air force. Dans: Bridge Design & Engineering, v. 13, n. 47 (2e trimestre 2007).
  15. Russell, Helena (2007): Hybrid composites emerge as engineers seek to exploit best properties. Dans: Bridge Design & Engineering, v. 13, n. 47 (2e trimestre 2007).
  16. Russell, Helena (2006): Health monitoring more important than ever, delegates hear. Dans: Bridge Design & Engineering, v. 12, n. 45 (4e trimestre 2006).
  17. Russell, Helena (2006): China leading the world in long-span bridge construction, IBC hears. Dans: Bridge Design & Engineering, v. 12, n. 44 (3e trimestre 2006).
  18. Russell, Helena (2006): Antwerp ring road bids go in. Dans: Bridge Update, n. 61 (juillet 2006).
  19. Russell, Helena (2006): Footbridge debate puts 'landmark' bridges on trial. Dans: Bridge Design & Engineering, v. 12, n. 42 (1er trimestre 2006).
  20. Russell, Helena (2005): Impreglio scoops Messina contract. Dans: Bridge Update, n. 55 (octobre 2005).
  21. Russell, Helena (2005): Flexible friends. Simplicity and flexibility are selling points for the formwork being used on two very different rail bridge projects in northern Italy. Dans: Bridge Design & Engineering, v. 11, n. 40 (3e trimestre 2005).
  22. Russell, Helena (2005): Funds still short for security, IBC hears. Dans: Bridge Design & Engineering, v. 11, n. 40 (3e trimestre 2005).
  23. Russell, Helena (2004): Japanese/HK joint venture lines up for the big challenge. Dans: Bridge Design & Engineering, v. 10, n. 35 (2e trimestre 2004).
  24. Russell, Helena (2003): Easy mover will speed Bay Bridge skyway. Dans: Bridge Design & Engineering, v. 9, n. 30 (1er trimestre 2003).
  25. Chan, Alexandre / Russell, Helena (2002): Creating a classic. A sensitive location demanded a special approach to design a new bridge. Dans: Bridge Design & Engineering, v. 8, n. 29 (4e trimestre 2002).
  26. Russell, Helena (1999): Egyptian high flyer. Just half an hour's drive north from El Ferdan, a second bridge cross the Suez Canal is being built. Dans: Bridge Design & Engineering, v. 5, n. 15 (2e trimestre 1999).
  27. Russell, Helena (1999): Christian Menn: bridge builder. Dans: Bridge Design & Engineering, v. 5, n. 15 (2e trimestre 1999).
  28. Russell, Helena (2001): Arches stretched to limit by new technology. Dans: Bridge Design & Engineering, v. 7, n. 25 (4e trimestre 2001).
  29. Russell, Helena (2001): Eugene Figg: people's champion. Dans: Bridge Design & Engineering, v. 7, n. 24 (3e trimestre 2001).
  30. Russell, Helena (2000): Greek triumph. Dans: Bridge Design & Engineering, v. 6, n. 21 (4e trimestre 2000).
Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine