Kirti D. Ruikar
- The need to improve double‐loop learning and design‐construction feedback loops. A survey of industry practice. Dans: Engineering, Construction and Architectural Management, v. 20, n. 3 (avril 2013). (2013):
- Time series analysis of local authority policy interventions on highway works durations. Dans: Proceedings of the Institution of Civil Engineers - Transport. :