M. Rosignoli
- Prestressed concrete box girder bridges with folded steel plate webs. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 134, n. 1 (février 1999). (1999):
- Nose optimization in launched bridges. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 134, n. 4 (novembre 1999). (1999):
- Serio River Bridge: creep and incremental launch. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 128, n. 1 (février 1998). (1998):
- Influences of The Incremental Launching Construction Method on The Sizing of Prestressed Concrete Bridge Decks. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 122, n. 3 (août 1997). (1997):
- Misplacement of Launching Bearings in PC Launched Bridges. Dans: Journal of Bridge Engineering (ASCE), v. 3, n. 4 (novembre 1998). (1998):
- Solution of The Continuous Beam in Launched Bridges.. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 122, n. 4 (novembre 1997). (1997):
- Robustness and Stability of Launching Gantries and Movable Shuttering Systems - Lessons Learned. Dans: Structural Engineering International, v. 17, n. 2 (mai 2007). (2007):