David F. Rogge
- Delay Reporting Within Cost Accounting System. Dans: Journal of Construction Engineering and Management, v. 110, n. 2 (mars 1984). (1984):
- Research Needs in Steel and Concrete Construction. Dans: Journal of Construction Engineering and Management, v. 113, n. 3 (septembre 1987). (1987):