C. M. Roberts
- Risk considerations in decision-making for re-assessment of bridges and planning of remedial works. Présenté pendant: 15th IABSE Congress, Copenhagen, Denmark, 16-20 June 1996. (1996):
- Special Features of the Affric Hydro-Electric Scheme (Scotland). Dans: Proceedings of the Institution of Civil Engineers, v. 2, n. 5 (octobre 1953). (1953):
- The Garry and Moriston Hydro-Electric Schemes. Dans: Proceedings of the Institution of Civil Engineers, v. 11, n. 1 (septembre 1958). (1958):
- Design Aspects of the Strathfarrar and Kilmorack Hydroelectric Scheme. Dans: Proceedings of the Institution of Civil Engineers, v. 30, n. 3 (mars 1965). (1965):
- Fundamental Economics in Hydro-Electric Design. Dans: Journal of the Institution of Civil Engineers, v. 36, n. 6 (avril 1951). (1951):