Franz Riepler
- Felbertauern rockfall – avalanche gallery: Geological conditions and safety measures. Dans: Geomechanics and Tunnelling, v. 13, n. 6 (décembre 2020). (2020):
- Preliminary works for the new Semmering Base Tunnel - geotechnical monitoring of slope stabilization measures and earth retaining structures / Vorarbeiten für den Semmering-Basistunnel neu - geotechnisches Monitoring bei Hangsicherungen und Stützkonstruktionen. Dans: Geomechanics and Tunnelling, v. 7, n. 4 ( 2014). (2014):
- Initial hydrogeological and hydrological field investigation related to the development of a hydraulic Model for the Koralm Basis tunnel. Dans: Felsbau, v. 19, n. 6 ( 2001). (2001):