- Squeezing Assessment Along 2.84-km-Long Headrace Tunnel of a Small Hydropower Project in KPK, Pakistan: Comparison of Different Methods. Dans: International Journal of Geosynthetics and Ground Engineering, v. 5, n. 3 (10 juillet 2019). (2019):
- (2018): Numerical Verification of Empirically Designed Support for a Headrace Tunnel. Dans: Civil Engineering Journal, v. 4, n. 11 (novembre 2018).