A. Recupero
- Construction stages of cable-stayed bridges with composite deck. Dans: Bridge Structures, v. 8, n. 3-4 ( 2012). (2012):
- The influence of time-dependent phenomena in segmental construction of concrete cable-stayed bridges. Dans: Bridge Structures, v. 7, n. 4 ( 2011). (2011):
- Expanding the classic moment-curvature relation by a new perspective onto its axial strain. Dans: Computers and Concrete, v. 11, n. 6 (juin 2013). (2013):
- Ultimate Strength of Reinforced Concrete Circular Members Subjected to Axial Force, Bending Moment, and Shear Force. Dans: Journal of Structural Engineering (ASCE), v. 139, n. 6 (juin 2013). (2013):