- Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. Dans: Construction Management and Economics, v. 42, n. 9 (avril 2024). (2024):
- Dynamic Management of Risk Contingency in Complex Design-Build Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016). (2016):
- Cost and Schedule Monitoring of Industrial Building Projects: Case Study. Dans: Journal of Construction Engineering and Management, v. 135, n. 9 (septembre 2009). (2009):