Elżbieta Radziszewska-Zielina
- The application of method AHP to choose a construction enterprise for partnering cooperation. Dans: Budownictwo i Architektura, v. 13, n. 4 (décembre 2014). (2014):
- Preliminary identification and evaluation of parameters affecting the capacity of the operator-earthmoving machine system. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013). (2013):
- IT-based control and assessment of partnering relations in construction projects. Dans: Automation in Construction, v. 116 (août 2020). (2020):
- Public Procurement Procedure in Construction in Poland and problems with its application. Dans: Organization, Technology and Management in Construction. :
- Supporting the selection of a variant of the adaptation of a historical building with the use of fuzzy modelling and structural analysis. Dans: Journal of Cultural Heritage, v. 26, n. 4 (juillet 2017). (2017):
- Methods for Selecting the Best Partner Construction Enterprise in Terms of Partnering Relations. Dans: Journal of Civil Engineering and Management, v. 16, n. 4 (décembre 2010). (2010):
- Fuzzy Control of Partnering Relations of a Construction Enterprise/ Statybos įmonės partnerystės santykių neapibrežtumo kontrolė. Dans: Journal of Civil Engineering and Management, v. 17, n. 1 (avril 2011). (2011):
- An Exact Solution for the Resource-constrained Construction Scheduling Problem. Dans: Engineering Structures and Technologies, v. 8, n. 2 (juillet 2016). (2016):
- Planning the reconstruction of a historical building by using a fuzzy stochastic network. Dans: Automation in Construction, v. 84 (décembre 2017). (2017):