Liang Qin
- Automatic Construction and Uncertainty Analysis of Geological Profiles in Dredging Engineering Based on Multiple-Point Geostatistics. Dans: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 150, n. 6 (novembre 2024). (2024):
- Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model. Dans: Journal of Construction Engineering and Management, v. 148, n. 2 (février 2022). (2022):
- Digital twin-driven virtual sensor approach for safe construction operations of trailing suction hopper dredger. Dans: Automation in Construction, v. 132 (décembre 2021). (2021):
- Productivity analysis of trailing suction hopper dredgers using stacking strategy. Dans: Automation in Construction, v. 122 (février 2021). (2021):
- Wind power prediction method based on regime of switching kernel functions. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 153 (juin 2016). (2016):
- Data mining approach to construction productivity prediction for cutter suction dredgers. Dans: Automation in Construction, v. 105 (septembre 2019). (2019):
- Novel Method of Construction-Efficiency Evaluation of Cutter Suction Dredger Based on Real-Time Monitoring Data. Dans: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 144, n. 6 (novembre 2018). (2018):