D. G. Proverbs
- A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 2 (février 1998). (1998):
- A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Dans: Engineering, Construction and Architectural Management, v. 5, n. 4 (avril 1998). (1998):
- International construction performance comparisons: a study of ‘European’ and Australian contractors. Dans: Engineering, Construction and Architectural Management, v. 8, n. 4 (avril 2001). (2001):
- Competencies required by project managers for housing construction in Ghana. Implications for CPD agenda. Dans: Engineering, Construction and Architectural Management, v. 16, n. 4 (juillet 2009). (2009):
- Resilience to flooding: lessons from international comparison. Dans: Proceedings of the Institution of Civil Engineers - Urban Design and Planning, v. 162, n. 2 (juin 2009). (2009):
- Towards standardising the assessment of flood damaged properties in the UK. Dans: Structural Survey, v. 19, n. 4 (octobre 2001). (2001):
- A comparative evaluation of planning engineers' formwork productivity rates in European construction. Dans: Building and Environment, v. 33, n. 4 (juillet 1998). (1998):
- Factors impacting construction project duration: a comparison between France, Germany and the U.K.. Dans: Building and Environment, v. 34, n. 2 (mars 1998). (1998):
- A method for estimating labour requirements and costs for international construction projects at inception. Dans: Building and Environment, v. 34, n. 1 (janvier 1998). (1998):
- An evaluation of transportation systems for high rise concrete construction. Dans: Building and Environment, v. 31, n. 4 (juillet 1996). (1996):
- Factors in formwork selection: a comparative investigation. Dans: Building Research & Information, v. 27, n. 2 ( 1999). (1999):
- Factors influencing the choice of concrete supply methods. Dans: Building Research & Information, v. 25, n. 3 ( 1997). (1997):
- Scaffolding for high-rise concrete construction: A French, German and UK comparison. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 128, n. 1 (février 1998). (1998):
- Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 8 (août 2008). (2008):
- A theoretical model for optimum project (time) performance based on European best practice. Dans: Construction Management and Economics, v. 18, n. 6 (septembre 2000). (2000):
- Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors. Dans: Construction Management and Economics, v. 17, n. 1 (janvier 1999). (1999):
- European construction contractors: a productivity appraisal of in situ concrete operations. Dans: Construction Management and Economics, v. 17, n. 2 (mars 1999). (1999):
- Construction resource/method factors influencing productivity for high rise concrete construction. Dans: Construction Management and Economics, v. 17, n. 5 (septembre 1999). (1999):
- Receiver operating characteristic (ROC) curve analysis of the effectiveness of construction planning efforts in Australia and the United Kingdom. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 1 (février 2003). (2003):