G. Price
- Jacked piles in London Clay: a study of load transfer and settlement under working conditions. Dans: Géotechnique, v. 29, n. 2 (juin 1979). (1979):
- Installation and Performance of Monitoring Systems at the Mansion House.. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 107, n. 2 (avril 1994). (1994):
- Queen Elizabeth II Conference Centre: Monitoring of Load Sharing Between Piles and Raft. Dans: Proceedings of the Institution of Civil Engineers, v. 80, n. 6 (décembre 1986). (1986):