M. Preene
- Construction Dewatering in Low-permeability Soils: Some Problems and Solutions.. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 107, n. 1 (janvier 1994). (1994):
- Performance of Ejectors in Construction Dewatering Systems.. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 107, n. 3 (juillet 1994). (1994):
- Sir Harold Harding on the Choice of Expedients in Civil Engineering Construction. Includes Select Bibliography and Extracts From 'the Choice of Expedients in Civil Engineering Construction', First Published in Ice Engineering Division Papers, Volume 5. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 107, n. 4 (octobre 1994). (1994):
- The Use of Simple Relief Wells in Reducing Water Pressure Beneath a Trench Excavation. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 119, n. 4 (octobre 1996). (1996):
- Assessment of settlements caused by groundwater control. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 143, n. 4 (octobre 2000). (2000):
- Environmental regulation of groundwater abstraction for dewatering works. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 149, n. 2 (avril 2001). (2001):
- Groundwater control for construction in the Lambeth Group. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 155, n. 4 (octobre 2002). (2002):
- Sustainable groundwater-source cooling systems for buildings. Dans: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 161, n. 2 (juin 2008). (2008):
- Ground energy systems: delivering the potential. Dans: Proceedings of the Institution of Civil Engineers - Energy, v. 162, n. 2 (mai 2009). (2009):