Jindrich Potucek
- (2024): Optimization Process of Railway Segmental Bridges Constructed by Balanced Cantilever Method. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2023): Stay-cable Bridge Construction Accelerated. The New Bridge over the Ohio River. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- (2022): Cost and process optimization of precast segmental bridges in Israel. Présenté pendant: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022.
- (2019): Palmetto Section 5 SR-826/SR-836 Interchange. Présenté pendant: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019.
- (2018): Motsa Bridge, Israel - Design and Construction Engineering Challenges. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018.