M. Połoński
- Causes and Effects of Adverse Events During Water Supply and Sewerage System Constructions. Dans: Archives of Civil Engineering, v. 62, n. 1 (mars 2016). (2016):
- Identification of the Interference in the Investment Process During the Realization of a Shopping Centre – A Case Study. Dans: Archives of Civil Engineering, v. 62, n. 1 (mars 2016). (2016):
- Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules. Dans: Archives of Civil Engineering, v. 61, n. 1 (mars 2015). (2015):
- Impact of Baseline Terms on the Course of Critical Paths and Time Buffers in the Modified Goldratt’s Method. Dans: Archives of Civil Engineering, v. 59, n. 3 (septembre 2013). (2013):