David Place
- Kayang Bridge - A Model for Urban Infrastructure Development in Korea. Présenté pendant: IABSE Congress: Structural Engineering for Meeting Urban Transportation Challenges, Lucerne, Switzerland, 18-21 September 2000. (2000):
- (2013): East London Line Phase 2. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- East London line enabling works contracts. Dans: Proceedings of the Institution of Civil Engineers - Transport, v. 166, n. 1 (février 2013). (2013):
- (2010): A new railway for old in east London. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.
- Track-structure interaction on the Taiwan high speed rail viaducts. Présenté pendant: IABSE Symposium: Structures for High-Speed Railway Transportation, Antwerp, Belgium, 27-29 August 2003. (2003):