0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Pardis Pishdad-Bozorgi ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Pishdad-Bozorgi, Pardis / Yoon, Jong Han (2022): Transformational approach to subcontractor selection using blockchain-enabled smart contract as trust-enhancing technology. Dans: Automation in Construction, v. 142 (octobre 2022).

    https://doi.org/10.1016/j.autcon.2022.104538

  2. Yoon, Jong Han / Pishdad-Bozorgi, Pardis (2022): Game Theory-Based Framework for Analyzing the Collaborative Dynamic of Tacit Knowledge Sharing and the Choice of Procurement and Contract Types in Mega Construction Projects. Dans: Buildings, v. 12, n. 3 (8 mars 2022).

    https://doi.org/10.3390/buildings12030305

  3. Yoon, Jong Han / Pishdad-Bozorgi, Pardis (2022): State-of-the-Art Review of Blockchain-Enabled Construction Supply Chain. Dans: Journal of Construction Engineering and Management, v. 148, n. 2 (février 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002235

  4. Gao, Xinghua / Pishdad-Bozorgi, Pardis / Shelden, Dennis R. / Tang, Shu (2021): Internet of Things Enabled Data Acquisition Framework for Smart Building Applications. Dans: Journal of Construction Engineering and Management, v. 147, n. 2 (février 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001983

  5. Wang, Guangbin / Lu, Hao / Hu, Wenan / Gao, Xinghua / Pishdad-Bozorgi, Pardis (2020): Understanding Behavioral Logic of Information and Communication Technology Adoption in Small- and Medium-Sized Construction Enterprises: Empirical Study from China. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 6 (novembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000843

  6. Tang, Shu / Shelden, Dennis R. / Eastman, Charles M. / Pishdad-Bozorgi, Pardis / Gao, Xinghua (2020): BIM assisted Building Automation System information exchange using BACnet and IFC. Dans: Automation in Construction, v. 110 (février 2020).

    https://doi.org/10.1016/j.autcon.2019.103049

  7. Gao, Xinghua / Pishdad-Bozorgi, Pardis (2019): A framework of developing machine learning models for facility life-cycle cost analysis. Dans: Building Research & Information, v. 48, n. 5 (septembre 2019).

    https://doi.org/10.1080/09613218.2019.1691488

  8. Pishdad-Bozorgi, Pardis / Austin, Robert B. / De La Garza, Jesus M. (2017): Network Analysis of Flash-Track Practices. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 1 (janvier 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000466

  9. Tang, Shu / Shelden, Dennis R. / Eastman, Charles M. / Pishdad-Bozorgi, Pardis / Gao, Xinghua (2019): A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends. Dans: Automation in Construction, v. 101 (mai 2019).

    https://doi.org/10.1016/j.autcon.2019.01.020

  10. De La Garza, Jesus M. / Pishdad-Bozorgi, Pardis (2018): Workflow Process Model for Flash Track Projects. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001501

  11. Pishdad-Bozorgi, Pardis / Gao, Xinghua / Eastman, Charles / Self, Alonzo Patrick (2018): Planning and developing facility management-enabled building information model (FM-enabled BIM). Dans: Automation in Construction, v. 87 (mars 2018).

    https://doi.org/10.1016/j.autcon.2017.12.004

  12. Austin, Robert B. / Pishdad-Bozorgi, Pardis / De La Garza, Jesus M. (2016): Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001061

  13. Pishdad-Bozorgi, Pardis (2017): Future Smart Facilities: State-of-the-Art BIM-Enabled Facility Management. Dans: Journal of Construction Engineering and Management, v. 143, n. 9 (septembre 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001376

  14. Pishdad-Bozorgi, Pardis / De La Garza, Jesus M. / Austin, Robert B. (2016): Readiness Assessment for Flash Tracking. Dans: Journal of Construction Engineering and Management, v. 142, n. 12 (décembre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001190

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine